SIGNIFICANCE AND USE 5.1 This practice applies to response actions for all types of asbestos-containing materials, including surfacing materials, thermal systems insulation, and miscellaneous materials, whether friable or not, regardless of the quantities involved and the reason for conducting the response action. 5.1.1 Abatement for the purpose of removing asbestos-containing materials or encapsulating or enclosing them, regardless of the engineering controls and work practices used, requires performance of visual inspections as described in this practice. 5.1.2 Operations and maintenance (O&M) activities, such as removal, encapsulation, or enclosure of asbestos-containing materials incidental to repair or replacement of a component, clean-up of debris from a fiber release episode, or other preventive measures, require the performance of visual inspections as described in this practice. See Managing Asbestos in Place7 and Guidance Manual. 5.1.3 This practice applies to response actions performed under a contract from the building owner, as well as to work performed by the building owner's staff. 5.2 The specific objectives of the visual inspection process before, during, and at the conclusion of an asbestos abatement project are: to review the extent of asbestos-containing material (ACM) within the scope of work, to monitor performance of the work, and to verify if visible residue, dust or debris, or unremoved material are absent at the completion of removal and clean-up activities. 5.2.1 The visual inspection process is used to evaluate all four aspects of an asbestos abatement project as follows: 5.2.1.1 Extent of ACM within Scope of Work—The building survey which is intended to locate and quantify asbestos-containing materials is not properly called a “visual inspection” within the context of this practice. To define the extent of ACM involved, a building survey is a necessary prelude to the first step of the visual inspection process. The building survey, which ma... SCOPE 1.1 This practice covers procedures for performing visual inspections of asbestos response actions to: 1.1.1 Establish the extent of the required work before it begins; 1.1.2 Determine the progress and quality of the work and evaluate the completeness of the response action; and 1.1.3 Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers. 1.2 This practice can be used on an abatement project, or for operations and maintenance (O&M) work, performed by the building owner's staff. It can also be used in conjunction with contract documents between the building owner and other parties involved in an abatement project. Note 1: Standard contract documents (such as AIA and EJCDC documents) define contractual relationships and responsibilities for projects within the construction industry. Asbestos abatement projects differ from traditional construction projects in the manner of their design and execution, as well as in the type and level of oversight required to substantiate their successful completion. Non-traditional responsibilities are given to the building owner, project designer, and abatement contractor by this practice. Furthermore, responsibilities related to project oversight, inspections, and approvals are placed upon an additional non-traditional representative of the building owner; the project monitor, as defined by this practice. All parties are cautioned that the subject authorities and corresponding responsibilities be understood, mutually agreed upon, and correspondingly addressed with appropriate modifications, if necessary, to the contract documents for a specific project. 1.3 This practice provides the following information: 1.3.1 The objectives of the visual inspection process; 1.3.2 The responsibilities and qualifications of the individuals involved in the visual inspections; 1.3.3 The...
Abstract
Overview
ASTM E1368-23: Standard Practice for Visual Inspection of Asbestos Abatement Projects establishes uniform procedures for conducting visual inspections during asbestos abatement and operations and maintenance (O&M) work. Issued by ASTM International, this standard covers response actions involving all types of asbestos-containing materials (ACM), including surfacing materials, thermal system insulation, and miscellaneous materials, whether friable or non-friable.
This practice applies to both large-scale abatement projects and small, incidental O&M activities-regardless of scale, engineering controls, or contracting arrangement. Its main goal is to ensure that abatement or O&M actions are thoroughly inspected for completeness, cleanliness, and compliance with established specifications and regulations to minimize asbestos exposure risks.
Key Topics
-
Scope of Application:
- Applies to all projects involving removal, encapsulation, or enclosure of asbestos-containing materials.
- Covers both contracted work and tasks performed by building owner’s staff.
-
Inspection Stages:
- Pre-project-assessment of ACM extent and conditions.
- During work-monitoring progress and quality.
- Post-abatement-verifying absence of visible residue, dust, debris, and unremoved material.
-
Participant Responsibilities:
- Building owner is ultimately responsible for inspection compliance, whether through self-evaluation or by engaging a qualified representative.
- Owner’s representatives, such as project monitors and designers, must plan inspections, define acceptance criteria, and document results.
- Abatement contractors are responsible for internal quality checks and for providing access and resources for project monitors.
-
Inspector Qualifications:
- Visual inspectors must have relevant experience or credentials in asbestos abatement, building construction, or industrial hygiene.
- Training such as AHERA accreditation or completion of recognized professional courses is recommended.
- Inspectors should possess adequate physical and visual competency to conduct thorough assessments.
-
Inspection Criteria:
- Cleanliness standards specify that all visible residue, dust, debris, and required removals must be addressed before final approval.
- Passing visual inspection is a prerequisite for final air clearance testing, though it does not substitute for required air monitoring.
Applications
Visual inspections per ASTM E1368-23 are essential throughout the lifecycle of asbestos abatement and maintenance, including:
- Building Renovation and Demolition: Ensuring all ACM is removed or properly enclosed/encapsulated before new construction or teardown proceeds.
- School and Commercial Facilities: Verification of compliance with federal (e.g., EPA AHERA) and state asbestos management regulations.
- Small-scale Maintenance: Clean-up after minor repairs, fiber release episodes, or preventive maintenance where ACM is disturbed.
- Contract Documentation: Defining acceptance criteria, inspection schedules, and roles within contractual agreements for abatement.
These inspections provide assurance that regulated areas are safe for re-occupancy, and that abatement activities meet legal and safety standards. Proper visual inspections are crucial in minimizing health risks associated with asbestos fiber exposure and are often required by regulatory authorities before spaces can be reoccupied.
Related Standards
To support thorough asbestos inspection and abatement, the following ASTM and regulatory standards are frequently referenced alongside ASTM E1368-23:
- ASTM E2356: Practice for Comprehensive Building Asbestos Surveys
- ASTM D7521: Test Method for Asbestos in Soil
- ASTM E2394: Practice for Maintenance, Renovation, and Repair of Installed Asbestos Cement Products
- ASTM E631: Terminology of Building Constructions
- 29 CFR 1926.1101: OSHA Construction Standard for Asbestos
- 40 CFR 61, Subpart M: EPA National Emission Standards for Hazardous Air Pollutants (NESHAP): Asbestos
- 40 CFR 763, Subpart E: EPA AHERA Regulations for Asbestos in Schools
Adhering to ASTM E1368-23 in conjunction with these standards ensures a comprehensive approach to asbestos abatement, safeguarding occupant health and regulatory compliance.
Технические детали
- Технический комитет
- D22 - Air Quality
- SKU
- ASTM E1368-23
Похожие стандарты
Другие стандарты ASTM
ASTM-TPT-47
Phase I & Phase II Environmental Site Assessment Processes
Phase I & Phase II Environmental Site Assessment Processes
ASTM-TPT-8
Phase I Environmental Site Assessment Practices For Commercial Real Estate: Phase I Site Assessment & Transac…
ASTM-TPT-1137
ASTM D975 Standard Specification for Diesel Fuel
ASTM D975 Standard Specification for Diesel Fuel
ASTM-TPT-1202
ASTM D8421 Standard Test Method for Determination of Per- and Polyfluoroalkyl Substances (PFAS) in Aqueous Ma…
ASTM D8421 Standard Test Method -- eLearning Course
ASTM-TPT-691
Microaprendizagem para D4057: Amostragem de ponto (PT)
D4057 Microlearning: Spot Sampling Portuguese
ASTM-TPT-1091
Metodo de prueba estandar D4052 de ASTM -- Curso de aprendizaje electrónico (ES)
Modulo eLearning para ASTM D4052 en espanol
ASTM ACEM20180086
Using Neutron Radiography to Quantify the Settlement of Fresh Concrete
Specifications have been implemented for concrete bridge decks in North America that restrict the use of higher slump concrete mixtures primarily because of concerns about differential settlement and…
ASTM ACEM20180041
Experimental Study of Competing Failure of Reinforced Concrete Based on the Weibull Distribution
To predict the failure lifetime of reinforced concrete, a current accelerating corrosion test was performed on concrete by simulating the environment in an area with saline soil. To study the concret…