ASTM STP47751S PDF
Requirements for Turbine and Generator Rotor Forgings
Requirements for Turbine and Generator Rotor Forgings
- Статус документа:
- D
- Формат:
- Электронный (PDF)
- Количество страниц:
- 12
- Технический комитет:
- A01
- SKU:
- ASTM STP47751S
Abstract
In this report I shall attempt to give a short survey of the American power-generation industry together with estimates of our future demands on rotor forgings. Figure 1 gives an indication of the size of the equipment manufactured, and will also point out the number of heavy rotor forgings required for what is today only an average size machine. Figure 2 shows the rapid increase in installed generating capacity in this country. Currently, there are over 100,000,000 kw of installed capacity, of which 23 per cent is hydroelectric, 2 per cent is internal combustion, and the remaining 75 per cent is steam turbine. Consumption of electric power in the United States more than doubles every ten years, and there are many indications that this rate of increase will continue in the future. At the present time almost all steam turbines of over 100,000-kw capacity are of the reheat type in which the steam, after expanding through a relatively small number of stages, is returned to the boiler for reheating back to, or close to, the initial throttle temperature. Although the great majority of these units are of the single reheat type, a few very large units now in design or in construction are for double reheat in which the steam is returned twice to the boiler for reheating. Figure 3 shows the traditional rate at which throttle and reheat temperatures have increased through the years. This particular figure is not up to date at this writing (Nov. 1957) since it does not indicate a 1200 F (650 C) unit now in construction. The greatest percentage of our units are for 1050 F (565 C) or 1000 F (540 C) initial and reheat temperatures, although there are several outstanding machines either in operation or under construction which utilize higher throttle temperatures. For instance, there are several units in New Jersey which operate at 1100 F (595 C); the 125,-000-kw Philo unit of American Gas and Electric Co. is in operation with 1150 F (620 C) throttle temperature; while the Eddystone unit now under construction for the Philadelphia Electric Co. will have a 1200 F (650 C) throttle temperature.
Похожие стандарты
Другие стандарты ASTM
ASTM-TPT-47
Phase I & Phase II Environmental Site Assessment Processes
Phase I & Phase II Environmental Site Assessment Processes
ASTM-TPT-8
Phase I Environmental Site Assessment Practices For Commercial Real Estate: Phase I Site Assessment & Transac…
ASTM-TPT-1137
ASTM D975 Standard Specification for Diesel Fuel
ASTM D975 Standard Specification for Diesel Fuel
ASTM-TPT-1202
ASTM D8421 Standard Test Method for Determination of Per- and Polyfluoroalkyl Substances (PFAS) in Aqueous Ma…
ASTM D8421 Standard Test Method -- eLearning Course
ASTM-TPT-691
Microaprendizagem para D4057: Amostragem de ponto (PT)
D4057 Microlearning: Spot Sampling Portuguese
ASTM-TPT-1091
Metodo de prueba estandar D4052 de ASTM -- Curso de aprendizaje electrónico (ES)
Modulo eLearning para ASTM D4052 en espanol
ASTM ACEM20180086
Using Neutron Radiography to Quantify the Settlement of Fresh Concrete
Specifications have been implemented for concrete bridge decks in North America that restrict the use of higher slump concrete mixtures primarily because of concerns about differential settlement and…
ASTM ACEM20180041
Experimental Study of Competing Failure of Reinforced Concrete Based on the Weibull Distribution
To predict the failure lifetime of reinforced concrete, a current accelerating corrosion test was performed on concrete by simulating the environment in an area with saline soil. To study the concret…