BS ISO/IEC 16326:2009 PDF
Systems and software engineering. Life cycle processes. Project management
Systems and software engineering. Life cycle processes. Project management
- Статус документа:
- Отменён
- Формат:
- Электронный (PDF)
- Дата публикации:
- 31 января 2010 г.
- ICS:
- 35.080
- Технический комитет:
- IEC
- SKU:
- BS ISO/IEC 16326:2009
Abstract
BS ISO/IEC 16326:2009 Systems and software engineering. Life cycle processes. Project management BS ISO/IEC 16326 is intended to aid project managers in managing to successful conclusion those projects concerned with software-intensive systems and software products. BS ISO/IEC 16326 specifies the required content of the project management plan (PMP). This International Standard also quotes the extracted purpose and outcome statements from the project processes of ISO/IEC 12207:2008 (IEEE Std 12207-2008) and ISO/IEC 15288:2008 (IEEE Std 15288-2008), and adds detailed guidance for managing projects that use these processes for software products and software intensive systems. BS ISO/IEC 16326 is written for those who use or plan to use (IEEE Std 15288- 2008) and (IEEE Std 12207-2008) on projects dealing with software-intensive systems and software products, regardless of project scope, product, methodology, size or complexity. The field of application of this International Standard spans the whole software or system life cycle, and addresses everybody who plays a role in project management – project managers and others, specifically:
Похожие стандарты
Другие стандарты BS