BS EN ISO 7539-4:1995
Corrosion of metals and alloys. Stress corrosion testing - Preparation and use of uniaxially loaded tension specimens
Corrosion of metals and alloys. Stress corrosion testing - Preparation and use of uniaxially loaded tension specimens
- Статус документа:
- D
- Формат:
- Электронный (PDF)
- Дата публикации:
- 31 июля 1990 г.
- ICS:
- 77.060
- Технический комитет:
- CEN
- SKU:
- BS EN ISO 7539-4:1995
Abstract
What is ISO 7539-4 – Corrosion of metal and alloys about?
ISO 7539-4 is an international standard and a part of the ISO 7539 series that discusses the Preparation and use of uniaxially loaded tension specimens for corrosion of metals and alloys. Corrosion is a type of oxidisation whereas rusting is a part of corrosion. If an alloy contains ferrous metal (iron), it will rust.
ISO 7539-4 covers procedures for designing, preparing and using uniaxially loaded tension test specimens for investigating the susceptibility of metal to stress corrosion. The term “metal” as used in this part of ISO 7539 includes alloys.
<span data-contrast="auto" data-mce-fragment="1"...
Похожие стандарты
Упомянутые в описании и другие стандарты BS
ISO 7539-4:1989
ДействующийCorrosion of metals and alloys — Stress corrosion testing — Part 4: Preparation and use of uniaxially loaded…
ISO 7539-4:1989 - Overview ISO 7539-4:1989 is part of the ISO 7539 series on Corrosion of metals and alloys - Stress corrosion testing. This part specifies procedures for the design, preparation and…
ISO 7539-8:2000
ДействующийCorrosion of metals and alloys — Stress corrosion testing — Part 8: Preparation and use of specimens to evalu…
Overview ISO 7539-8:2000, "Corrosion of metals and alloys - Stress corrosion testing - Part 8: Preparation and use of specimens to evaluate weldments," specifies guidance for stress corrosion testing…
BS ISO 10835:2007
ДействующийDirect reduced iron and hot briquetted iron. Sampling and sample preparation.
1 Scope This International Standard gives a) the underlying theory, b) the basic principles for sampling and preparation of samples , and c) the basic requirements for the design, installation and op…