BS IEC 60768:2009
Nuclear power plants. Instrumentation important to safety. Equipment for continuous in-line or on-line monitoring of radioactivity in process streams for normal and incident conditions
Nuclear power plants. Instrumentation important to safety. Equipment for continuous in-line or on-line monitoring of radioactivity in process streams for normal and incident conditions
- Статус документа:
- Действующий
- Формат:
- Электронный (PDF)
- Дата публикации:
- 31 мая 2009 г.
- ICS:
- 27.120.10
- SKU:
- BS IEC 60768:2009
Abstract
What is BS IEC 60768 - Radiation monitoring equipment for nuclear power plants about?
Information regarding the levels of radioactive materials in defined process streams of nuclear power plants is necessary to evaluate plant performance, to provide at an early stage information on possible radioactive releases, and to allow plant operators to take actions to control these releases. BS IEC 60768 specifically focuses on process streams radiation monitoring systems used for normal and incident operations.
BS IEC 60768 is an international standard that provides criteria for the design, selection, testing, calibration, and functional location of equipment for the monitoring of radioactive substances within plant process streams during normal operation conditions and anticipated operational occurrences.
BS IEC 60768 is only applicable to continuous in-line or on-line meas...
Похожие стандарты
Упомянутые в описании и другие стандарты BS
IEC 60768:2009
ДействующийNuclear power plants - Instrumentation important to safety - Equipment for continuous in-line or on-line moni…
Overview IEC 60768:2009 is an international standard developed by the International Electrotechnical Commission (IEC) that establishes criteria for instrumentation important to safety in nuclear powe…
BS ISO 10835:2007
ДействующийDirect reduced iron and hot briquetted iron. Sampling and sample preparation.
1 Scope This International Standard gives a) the underlying theory, b) the basic principles for sampling and preparation of samples , and c) the basic requirements for the design, installation and op…