IEC 61400-25-5:2017
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
- Статус документа:
- Действующий
- Формат:
- Электронный (PDF)
- Количество страниц:
- 56
- Дата публикации:
- 20 сентября 2017 г.
- Издание:
- IEC IS 61400 edition 2 version 1
- ICS:
- 27.180
IEC 61400-25-5:2017 specifies standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended. This part of IEC 61400-25 defines: the methods and abstract test cases for compliance testing of server and client devices used in wind power plants; the metrics to be measured in said devices according to the communication requirements specified in IEC 61400-25 (all parts). This new edition includes the following significant technical changes with respect to the previous edition: - harmonization with structure and test cases in IEC 61850-10:2012; - reduction of overlap between standards and simplification by increased referencing to the IEC 61850 standard series.
Abstract
Overview
IEC 61400-25-5:2017 (Edition 2.0) is part of the IEC 61400‑25 series addressing communications for monitoring and control of wind power plants. This part specifies standardized techniques and abstract test cases for compliance testing of communications implementations in wind energy systems. Its purpose is to define methods and measurement techniques used when declaring performance parameters so that devices integrate easily, operate correctly, and support intended applications.
Key topics and technical requirements
- Scope of testing: Defines compliance testing methods for both server and client devices used in wind power plants, including the metrics to be measured against the communication requirements of IEC 61400‑25 (all parts).
- Test structure and methodology: Provides a structured approach to compliance assessment, including test procedure templates, test system architectures for server/client testing, and requirements for test case design.
- Device-related compliance tests: Covers documentation checks, data model validation, association (session) tests, reporting (buffered and unbuffered), logging, substitution, and the control model (including direct operation and select-before-operate semantics).
- Performance tests: Includes communication latency (transfer time) tests and time synchronization and accuracy tests, following a black‑box testing principle to measure real-world performance.
- Quality assurance and reporting: Specifies quality plans, testing processes, and the required content for a compliance test report and acceptance criteria.
- Harmonization and references: Edition 2.0 harmonizes test structure and cases with IEC 61850‑10:2012 and reduces overlap by increased referencing to the IEC 61850 standard series. The use of SCL files is out of scope for this edition (planned for a future edition).
Practical applications and who uses this standard
IEC 61400‑25‑5:2017 is intended for:
- Wind turbine manufacturers and device vendors validating that their communication interfaces meet IEC 61400‑25 requirements.
- System integrators and SCADA vendors assessing interoperability of server and client implementations.
- Test laboratories and certification bodies conducting formal compliance testing and issuing conformance reports.
- Wind farm operators and asset owners evaluating equipment performance and integration risk during procurement.
Benefits include improved interoperability, clearer procurement specifications, measurable performance claims (latency, time accuracy), and streamlined system integration.
Related standards
- IEC 61400‑25 (series) - communications for monitoring and control of wind power plants
- IEC 61850 (series) - harmonized substation and power system communication standards (notably IEC 61850‑10:2012 referenced for test structure)
Keywords: IEC 61400-25-5:2017, compliance testing, wind power plants, communications, IEC 61850 harmonization, server and client devices, transfer time, time synchronization, performance tests.
Технические детали
- Технический комитет
- TC 88 - Wind energy generation systems
- SKU
- IEC 61400-25-5:2017
Похожие стандарты
Стандарты, упомянутые в описании
IEC 61850-10:2012
ДействующийCommunication networks and systems for power utility automation - Part 10: Conformance testing
Overview IEC 61850-10:2012 (Consolidated with Amendment) defines standardized methods for conformance testing within the IEC 61850 family - the communications framework for power utility automation.…
IEC 61400-25-2:2015
ДействующийWind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
Overview IEC 61400-25-2:2015 is an international standard published by the International Electrotechnical Commission (IEC) that defines the information models for communications in wind power plants.…
IEC TR 61850-90-30:2025
ДействующийCommunication networks and systems for power utility automation - Part 90-30: IEC 61850 Function Modelling in…
Overview IEC TR 61850-90-30:2025 (Communication networks and systems for power utility automation - Part 90-30) is a Technical Report that defines extensions to the SCL Substation/Process Section to…