Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 1: Generic RAMS process
Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 1: Generic RAMS process
- Статус документа:
- Действующий
- Формат:
- Электронный (PDF)
- Количество страниц:
- 97
- Дата публикации:
- 24 июля 2025 г.
- Издание:
- IEC IS 62278 edition 1 version 1
- ICS:
- 45.060.01
IEC 62278-1:2025 addresses railway specifics, enables conflicts between RAMS elements to be controlled and managed effectively. This document specifies: a) a process, based on the system life cycle and tasks within it, for managing RAMS; b) a systematic process, tailorable to the type and size of the system under consideration, for specifying requirements for RAMS and demonstrating that these requirements are achieved. This document does not specify: c) RAMS targets, quantities, requirements or solutions for specific railway applications; d) rules or processes pertaining to the certification of railway products against the requirements of this document; e) an approval process for the railway stakeholders. This document is applicable to railway application fields, including signalling, rolling stock and fixed installations, and specifically: f) to the specification and demonstration of RAMS for all railway applications and at all levels of such an application, as appropriate, from complete railway systems to major systems and to individual and combined subsystems and components within these major systems, including those containing software; in particular: - to new systems; - to new systems integrated into existing systems already accepted, but only to the extent and insofar as the new system with the new functionality is being integrated. It is otherwise not applicable to any unmodified aspects of the existing system; - as far as reasonably practicable, to modifications and extensions of existing systems already accepted, but only to the extent and insofar as existing systems are being modified. It is otherwise not applicable to any unmodified aspect of the existing system; g) at all relevant phases of the life cycle of an application; h) for use by railway duty holders and the railway suppliers. This document is not applicable to: i) any unmodified aspects of the existing system; j) existing systems which remain unmodified, including those systems already compliant with IEC 62278:2002. This first edition, together with IEC 62278-2, cancels and replaces IEC 62278:2002. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) added 5.2 on multi level system approach; b) added 5.3 on railway system overview; c) added 5.9 on risk reduction strategy; d) updated the content of correlation of RAMS management process and system life cycle in 6.2; e) added 6.4 on organizational requirements; f) added 6.5 on application of this document and adaptability to project scope and size; g) added 6.8 on independent safety assessment; h) added Clause 8 on safety case; i) added Annex D providing guidance on system definition; The IEC 62278 series forms part of the railway sector specific application of IEC 61508. IEC 62278, IEC 62279 and IEC 62425 comprise the railway sector equivalent of the IEC 61508 series so far as railway communication, signalling and processing systems are concerned. When compliance with these documents has been demonstrated, further evaluation of compliance with the IEC 61508 series is not foreseen. A list of all parts in the IEC 62278 series, published under the general title Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS), can be found on the IEC website.
Abstract
Overview
IEC 62278-1:2025 - "Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 1: Generic RAMS process" defines a life-cycle based, tailorable process for managing RAMS in railway systems. It specifies how to set RAMS requirements and demonstrate their achievement for signalling, rolling stock and fixed installations across all life‑cycle phases. The standard focuses on process and demonstration rather than prescribing numeric RAMS targets, certification rules or stakeholder approval procedures.
Key Topics
- Generic RAMS process & life cycle: A 12‑phase RAMS life cycle (concept to decommissioning) with defined objectives, activities and deliverables for each phase.
- Multi‑level system approach: Guidance on system hierarchy, system definition and apportionment of RAMS requirements across systems, major systems, subsystems and components.
- Risk‑based methods: Risk assessment, risk reduction strategy and calibration of risk acceptance categories to control safety and RAM-related risks.
- Specification & demonstration: Tailorable procedures for specifying RAMS requirements and demonstrating compliance (verification, validation and documentation).
- Organizational and governance requirements: Added requirements for organizational roles, adaptability to project scope/size and independent safety assessment.
- Safety case: Clause on purpose and content of a safety case supporting demonstration of safety claims.
- Annexes & guidance: Informative annexes with RAM plan/safety plan examples, RAM parameters, risk matrix calibration and system‑definition guidance.
Applications
Who uses IEC 62278-1:2025:
- Railway duty holders, infrastructure managers and operators
- System and safety engineers (signalling, rolling stock, fixed installations)
- Suppliers, designers and integrators of railway systems and subsystems
- Project managers, maintenance planners and independent safety assessors
Practical uses:
- Developing RAMS management processes aligned to the system life cycle
- Defining system boundaries and apportioning reliability, availability and maintainability requirements
- Conducting risk assessments, formulating risk reduction strategies and preparing safety cases
- Planning verification, validation and independent safety assessment activities
- Adapting RAMS requirements for new systems, integrations or modifications (only to modified aspects)
Related Standards
- IEC 62278 series (this part with IEC 62278‑2 replaces IEC 62278:2002)
- IEC 62279 and IEC 62425 (railway sector equivalents)
- IEC 61508 (functional safety - sector application via the IEC 62278 family)
Keywords: IEC 62278-1:2025, RAMS, railway RAMS process, reliability, availability, maintainability, safety, safety case, life cycle, risk assessment, signalling, rolling stock.
Технические детали
- Технический комитет
- TC 9 - Electrical equipment and systems for railways
- SKU
- IEC 62278-1:2025
Похожие стандарты
Стандарты, упомянутые в описании
IEC 62278:2002
Railway applications - Specification and demonstration of reliability, availability, maintainability and safe…
Overview IEC 62278:2002 is an international standard published by the International Electrotechnical Commission (IEC). It addresses the specification and demonstration of reliability, availability, m…
IEC 62279:2015
ДействующийRailway applications - Communication, signalling and processing systems - Software for railway control and pr…
Overview IEC 62279:2015 is an international standard developed by the International Electrotechnical Commission (IEC) that specifies the process and technical requirements for the development of soft…
IEC 62425:2025
ДействующийRailway applications - Communication, signalling and processing systems - Safety related electronic systems f…
Overview IEC 62425:2025 - Edition 2.0 is the International Electrotechnical Commission standard for safety-related electronic systems for railway signalling. It defines requirements for the functiona…
IEC 61508-1:2010
ДействующийFunctional safety of electrical/electronic/programmable electronic safety-related systems - Part 1: General r…
Overview IEC 61508-1:2010 is a key international standard focusing on the functional safety of electrical, electronic, and programmable electronic (E/E/PE) safety-related systems. This standard, publ…