ISO 11297-3:2018
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 3: Lining with close-fit pipes
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 3: Lining with close-fit pipes
- Статус документа:
- Отменён
- Формат:
- Электронный (PDF)
- Количество страниц:
- 16
- Дата публикации:
- 31 августа 2018 г.
- Издание:
- ISO IS 11297 edition 2 version 1
- ICS:
- 23.040.20
This document, in conjunction with ISO 11297‑1, specifies requirements and test methods for close-fit lining systems intended to be used for the renovation of underground drainage and sewerage networks under pressure. It applies to pipes and fittings, as manufactured, as well as to the installed lining system. It is applicable to polyethylene (PE) pipes of either solid wall single layer or co-extruded layer construction, which is reduced in the factory or on site to provide a close-fitting independent or interactive pressure pipe liner, as well as associated fittings and joints for the construction of the lining system. It is not applicable to PE coated pipes having a peelable, contiguous, thermoplastic additional layer on the outside of the pipe. It is applicable to PE pipes, fittings and assemblies intended to be used at an operating temperature of 20 °C as the reference temperature. NOTE For applications operating at constant temperatures greater than 20 °C and up to 40 °C, see ISO 4427‑1:2007, Annex A.
Abstract
Overview - ISO 11297-3:2018 (close-fit lining)
ISO 11297-3:2018 is the International Standard that specifies requirements and test methods for close-fit lining systems used to renovate underground drainage and sewerage networks that operate under pressure. Used together with ISO 11297‑1 (General), this part covers polyethylene (PE) pipes - solid wall single-layer or co‑extruded - that are factory- or site‑reduced to form a close‑fitting, independent or interactive pressure pipe liner. The standard applies to pipes, fittings, joints and the installed lining system and uses 20 °C as the reference operating temperature.
Key topics and technical requirements
- Scope and applicability: Renovation of underground drainage and sewerage networks under pressure; excludes PE‑coated pipes with peelable outer layers.
- Materials and product stages: Requirements for raw materials and for products “as manufactured” (M stage) and “as installed” (I stage).
- Geometric, mechanical and physical characteristics: Specifications for dimensions, strength and physical performance of pipe and fittings.
- Jointing and fittings: Requirements for joints, fusion methods, electrofusion and associated fittings suitable for close‑fit liners.
- Installation practice: Guidance on preparatory work, storage, handling, reduction/reforming, winching/rod-pulling, and lining termination.
- Inspection, testing and sampling: Process‑related inspection, final testing, sampling plans and documentation to verify fitness for purpose after site processing.
- Regional requirements: Provisions allowing reference to mandated regional or European standards where applicable.
- Normative annex: Includes test method(s) such as determination of memory ability for factory‑folded heat‑reverted PE pipe.
Practical applications and target users
- Renovation contractors performing trenchless relining of pressurised sewer and drainage mains.
- Utility owners and asset managers specifying renovation materials and acceptance criteria.
- Pipe and fitting manufacturers designing PE close‑fit liners and joints.
- Inspection, testing and certification bodies verifying installed lining fitness and conformity.
- Consulting engineers and designers preparing rehabilitation specifications and tender documents.
Related standards and cross‑references
- ISO 11297‑1: General requirements for renovation of underground drainage and sewerage networks under pressure.
- ISO 11296 series, ISO 11298, ISO 11299: Other renovation system standards for different network types and techniques.
- ISO 4427‑1:2007, Annex A - referenced for applications with constant operating temperatures >20 °C and up to 40 °C.
Using ISO 11297-3:2018 helps ensure safe, durable and verifiable close‑fit PE lining solutions for pressurised sewer and drainage rehabilitation projects.
Технические детали
- Технический комитет
- ISO/TC 138/SC 8 - Rehabilitation of pipeline systems
- SKU
- ISO 11297-3:2018
Похожие стандарты
Стандарты, упомянутые в описании
ISO 4427-1:2007
ОтменёнPlastics piping systems — Polyethylene (PE) pipes and fittings for water supply — Part 1: General
ISO 11297-1:2018
ДействующийPlastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 1:…
Overview ISO 11297-1:2018 - Plastics piping systems for renovation of underground drainage and sewerage networks under pressure - Part 1: General - specifies the general requirements and test methods…
ISO 11296-4:2018
ДействующийPlastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 4: L…
Overview ISO 11296-4:2018 specifies requirements and test methods for cured‑in‑place pipes (CIPP) used to renovate underground non‑pressure drainage and sewerage networks. Intended to be used togethe…