Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)
Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)
SIGNIFICANCE AND USE 4.1 This practice is for use by designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of conduits through the use of a resin-impregnated fabric tube pulled-in-place through an existing conduit and secondarily inflated through the inversion of a calibration hose. Modifications may be required for specific job conditions. SCOPE 1.1 This practice describes the procedures for the reconstruction of pipelines and conduits (2 in. to 96 in. (5 cm to 244 cm) diameter) by the pulled-in-place installation of a resin-impregnated, flexible fabric tube into an existing conduit and secondarily inflated through the inversion of a calibration hose by the use of a hydrostatic head or air pressure (see Fig. 1). The resin is cured by circulating hot water, by the introduction of controlled steam into the tube, or by photoinitiated reaction. When cured, the finished cured-in-place pipe will be continuous and tight fitting. This reconstruction process may be used in a variety of gravity and pressure applications such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems. FIG. 1 Cured-in-Place Pipe Installation Methods 1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. Note 1: There are no ISO standards covering the primary subject matter of this practice. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
ASTM F1743-22 is the Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP). Developed by ASTM International, this practice addresses procedures for reconstructing pipelines and conduits ranging from 2 inches to 96 inches (5 cm to 244 cm) in diameter using a resin-impregnated fabric tube that is pulled into place, secondarily inflated, and cured to form a new, continuous, tight-fitting pipe within the existing conduit. This trenchless technology is designed to extend the service life of gravity and pressure pipes, such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems, with minimal surface disruption.
Scope and Applicability
Installation Process
Material Requirements
Quality Control and Inspection
Safety and Environmental Considerations
Другие стандарты ASTM
The ASTM F1743-22 standard offers practical solutions for pipeline rehabilitation where open-trench replacement is disruptive or impractical. Key application areas include:
By implementing this standard, asset owners achieve significant cost savings, reduce environmental impact, and minimize disruption to surrounding communities and businesses.
For complete and compliant pipeline rehabilitation projects, ASTM F1743-22 should be used in conjunction with other relevant standards, including:
These related standards provide further details on material selection, installation methods, and performance testing, ensuring a robust, high-quality rehabilitation result using cured-in-place pipe (CIPP) technologies.
Keywords: ASTM F1743-22, pipeline rehabilitation, cured-in-place pipe, CIPP, trenchless technology, pulled-in-place installation, resin-impregnated fabric tube, pipeline inspection, sewer rehabilitation, conduit renewal, pipeline standards.