IEC TR 63500:2024 provides the general information, items, conditions, and evaluation of test results for on-site system tests of unified power flow controller (UPFC) installations based on modular multi-level converter (MMC) technology. For special functions or performances that are claimed by specific projects, some extra test items not included in this document can be added according to the technical specification.
Abstract
Overview
IEC TR 63500:2024 – Unified Power Flow Controller (UPFC) Installations - System Tests provides comprehensive guidelines for conducting on-site system tests of unified power flow controller (UPFC) installations based on modular multi-level converter (MMC) technology. This technical report from the International Electrotechnical Commission (IEC) details the general requirements, items to test, test conditions, and evaluation of the results. IEC TR 63500:2024 is an essential resource for ensuring that UPFC installations operate safely, reliably, and in compliance with user and project requirements.
UPFC systems, leveraging MMC technology, are key elements in modern flexible AC transmission systems (FACTS) for improved power quality, grid stability, and efficient load management. This standard emphasizes functional verification post-installation and before commissioning, which is crucial for commercial operation and the integration of UPFC into existing power systems.
Key Topics
IEC TR 63500:2024 covers the following primary areas:
-
Test Stages & Structure: The system tests are organized in three main stages:
- Stage I: Converter Unit Tests – Verification of individual components such as transformers and converters.
- Stage II: System Function and Performance Tests – Assessment of performance under various steady-state and dynamic conditions.
- Stage III: Trial Operation – Validation of integrated system readiness for commercial operation.
-
Test Items: Includes trip tests, energizing tests for shunt and series transformers and converters, output phase sequence verification, initial operation, steady-state and dynamic performance, fault switching, auxiliary system transfer, grid control function (optional), overload and heavy load operation, and artificial short circuit tests (optional).
-
Test Preconditions: Essential prerequisites for system tests, such as completion of subsystem tests, proper configuration and isolation, operational auxiliary systems, validated protection schemes, and required safety clearances.
-
Evaluation of Results: Clear criteria for determining test success, such as correct operation of protection systems, absence of abnormal alarms, proper functional response, and compliance with contractual and safety requirements.
-
Special Project Adaptation: The standard allows for additional or modified test items for specific project needs, as stipulated in technical specifications.
Applications
IEC TR 63500:2024 is directly applicable in the following contexts:
- Installation and Commissioning: Power utilities, EPC contractors, and maintenance teams use this standard during the final phases before UPFC installations go live, ensuring all systems function as designed.
- Quality Assurance: Verification processes help confirm that the installed UPFC fully meets contract and technical requirements and is safely integrated into the wider AC grid.
- Routine Testing and Upgrades: The guidelines support ongoing operational validation, periodic maintenance, and upgrades to UPFC components, improving reliability and performance.
- Project Specification: Enables engineers to tailor test procedures for projects with specialized operational requirements or advanced UPFC functions.
By adhering to IEC TR 63500:2024, stakeholders reduce operational risk, ensure seamless grid integration, and uphold international best practices in power electronics and flexible transmission systems.
Related Standards
Several IEC and international standards are relevant when applying IEC TR 63500:2024:
- IEC TR 63262:2019 – Performance of UPFC in Electric Power Systems: Defines general performance requirements and terminology for UPFC installations.
- IEC 61975 – High-voltage direct current (HVDC) installations: Applicable for reference on system and subsystem testing methodologies.
- IEC 61803 – Determination of power losses in HVDC converter stations: Useful for performance assessment related to power conversion efficiency.
- ISO/IEC Directives – For standardized terminology and procedures in test reporting and practice.
For comprehensive power flow controller testing and commissioning in line with global best practices, IEC TR 63500:2024 provides essential, up-to-date guidance to the power transmission and distribution industry.
Технические детали
- Технический комитет
- SC 22F - Power electronics for electrical transmission and distribution systems
- SKU
- IEC TR 63500:2024
Похожие стандарты
Упомянутые в описании и другие стандарты IEC
EN IEC 61803:2026
ДействующийDetermination of power losses in high-voltage direct current (HVDC) converter stations
Overview EN IEC 61803:2026 - Determination of Power Losses in High-Voltage Direct Current (HVDC) Converter Stations is a key international standard developed by CLC and IEC. It offers standardized me…
IEC 60050-161:1990/AMD2:1998
ДействующийAmendment 2 - International Electrotechnical Vocabulary (IEV) - Part 161: Electromagnetic compatibility
IEC 60050-161:1990/AMD2:1998 – Electromagnetic Compatibility Vocabulary Amendment ### Overview The IEC 60050-161:1990/AMD2:1998 is the second amendment to the International Electrotechnical Vocabular…