IEC TS 61400-26-2:2014 PDF
Wind turbines - Part 26-2: Production-based availability for wind turbines
Wind turbines - Part 26-2: Production-based availability for wind turbines
- Статус документа:
- D
- Формат:
- Электронный (PDF)
- Количество страниц:
- 47
- Дата публикации:
- 4 июня 2014 г.
- Издание:
- IEC TS 61400 edition 1 version 1
- ICS:
- 27.180
IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with: - examples of determination of lost production, - examples of algorithms for production-based indicators, - examples of other performance indicators, - examples of application scenarios.
Технические детали
- Технический комитет
- TC 88 - Wind energy generation systems
- SKU
- IEC TS 61400-26-2:2014
Похожие стандарты
Другие стандарты IEC