PD ISO/TR 27918:2018 PDF
Lifecycle risk management for integrated CCS projects
Lifecycle risk management for integrated CCS projects
- Статус документа:
- Действующий
- Формат:
- Электронный (PDF)
- Дата публикации:
- 30 апреля 2018 г.
- ICS:
- 13.020.40
- SKU:
- PD ISO/TR 27918:2018
Abstract
1 Scope This document is designed to be an information resource for the potential future development of a standard for overall risk management for CCS projects. The risks associated with any one stage of the CCS process (capture, transportation, or storage) are assumed to be covered by specific standard(s) within ISO/TC 265 and other national and/or international standards. For example, the risks associated with CO 2 transport by pipelines are covered in ISO 27913. The scope of this document is intended to address more broadly applicable lifecycle risk management issues for integrated CCS projects. Specifically, the focus of this document is on risks that affect the overarching CCS project or risks that cut across capture, transportation, and storage affecting multiple stages. It needs to be noted that environmental risks, and risks to health and safety should be very low for CCS projects provided the project is carefully designed and executed. Risk identification and management is part of the due diligence process. A list of acronyms is included in Annex A. Clause 5 includes an analysis of how a CCS standard could address aspects of risk analysis that apply to all elements of the CCS chain, such as:
— risk identification (identifying the source of risk, event, and target of impact) 1 ;
— risk evaluation and rating;
— risk treatment;
— risk mana...
Похожие стандарты
Упомянутые в описании и другие стандарты PD