IEC 61850-4:2011
Communication networks and systems for power utility automation - Part 4: System and project management
Communication networks and systems for power utility automation - Part 4: System and project management
- Статус документа:
- Действующий
- Формат:
- Электронный (PDF)
- Количество страниц:
- 47
- Дата публикации:
- 3 ноября 2020 г.
- Издание:
- IEC IS 61850 edition 2 version 1
- ICS:
- 33.200
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.
Abstract
Overview
IEC 61850-4:2011 (Edition 2.1, consolidated 2020) defines system and project management requirements for utility automation systems (UAS), including substation automation systems (SAS). Part 4 of the IEC 61850 series focuses on how projects with communication between Intelligent Electronic Devices (IEDs) should be engineered, documented, tested, commissioned and maintained through the system life cycle. This standard is of core relevance for Smart Grid projects and aligns Part 4 with other IEC 61850 parts.
Key topics and technical requirements
- Engineering requirements and workflows
- Engineering process definition, parameter classification (categories/types), and tool roles (system specification, system configuration, IED configuration, documentation).
- Requirements for flexibility, expandability and scalability of engineering tools and projects.
- Project documentation
- Automatic and standard documentation outputs: hardware lists, parameter sets and project artifacts to support commissioning and maintenance.
- System life cycle management
- Product/version management, announcement and handling of product discontinuation, long‑term support and backward compatibility considerations.
- Quality assurance and testing
- Division of responsibilities among manufacturers, system integrators and customers.
- Test classifications and stages: type tests, conformance tests, factory acceptance test (FAT), site acceptance test (SAT), routine and maintenance tests.
- Support and change management
- Procedures for tool changes, project interactions, and the impact assessment of product updates on existing systems.
Practical applications and who uses it
IEC 61850-4 is intended for professionals involved in the design, delivery and operation of utility automation and Smart Grid systems:
- Utility engineers and asset owners - to define lifecycle, procurement and acceptance criteria for UAS/SAS projects.
- System integrators and project managers - to manage engineering workflows, toolchains and project documentation.
- IED and software vendors - to align product versioning, backward compatibility and discontinuation notices with customer needs.
- Test engineers and acceptance teams - to implement FAT, SAT and conformance testing plans that meet industry expectations.
Practical uses include creating standardized engineering tool chains, ensuring consistent parameter management across IEDs, documenting projects for regulatory compliance, and reducing integration risk during commissioning and expansions.
Related standards
Технические детали
- Технический комитет
- TC 57 - Power systems management and associated information exchange
- SKU
- IEC 61850-4:2011
Похожие стандарты
Упомянутые в описании и другие стандарты IEC
IEC TR 61850-90-30:2025
ДействующийCommunication networks and systems for power utility automation - Part 90-30: IEC 61850 Function Modelling in…
Overview IEC TR 61850-90-30:2025 (Communication networks and systems for power utility automation - Part 90-30) is a Technical Report that defines extensions to the SCL Substation/Process Section to…
IEC 62590-2-2:2026
ДействующийRailway applications - Electronic power converters for fixed installations - Part 2-2: DC Traction applicatio…
Overview IEC 62590-2-2:2026 is an international standard developed by the International Electrotechnical Commission (IEC) focusing on railway applications, specifically the electronic power converter…
IEC 61753-042-02:2026
ДействующийFibre optic interconnecting devices and passive components - Performance standard - Part 042-02: Plug-pigtail…
Overview IEC 61753-042-02:2026 establishes the minimum performance, test, and measurement requirements for plug-pigtail and plug-receptacle style OTDR (Optical Time-Domain Reflectometer) reflecting d…
IEC 61837-2:2018
ДействующийSurface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal le…
Overview IEC 61837-2:2018 - Surface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal lead connections - Part 2: Ceramic enclosures (Edition 3.0, 2018…
IEC 61851-23-1:2026
ДействующийElectric vehicle conductive charging system - Part 23-1: DC electric vehicle supply equipment - Automated con…
Overview IEC 61851-23-1:2026 is an international standard published by the International Electrotechnical Commission (IEC) that specifies requirements for DC electric vehicle supply equipment (EVSE)…
IEC 63506:2026
ДействующийCalibration of the prompt fission neutron logging tools
Overview IEC 63506:2026 - Calibration of the Prompt Fission Neutron Logging Tools is the international standard that specifies the calibration methods for prompt fission neutron (PFN) logging tools,…
IEC 63589-1:2026
ДействующийLinear accelerator - Electron linear accelerator for radiation processing - Part 1: General requirements and…
Overview IEC 63589-1:2026 specifies the general requirements and test methods for electron linear accelerator devices used in radiation processing. Developed by the International Electrotechnical Com…
IEC 61837-2:2018/AMD2:2026
ДействующийAmendment 2 - Surface mounted piezoelectric devices for frequency control and selection - Standard outlines a…
Overview IEC 61837-2:2018/AMD2:2026, published by the International Electrotechnical Commission (IEC), serves as Amendment 2 to the international standard for surface mounted piezoelectric devices us…