IEC TR 61850-10-3:2022(E), which is a technical report, is applicable to testing of applications within substations. It is intended to give practical guidelines to perform the stages of quality assurance defined in IEC 61850-4:2011. However, while the quality assurance in that document begins with the IED manufacturer development stage and focuses on the role of the system integrator this document focuses on end-user requirement fulfilment. The report may be useful to users applying IEC 61850 to other domains, however testing of IEC 61850 systems outside the substation domain is not within the scope of this document. This document describes: • A methodical approach to the verification and validation of a substation solution • The use of IEC 61850 resources for testing in Edition 2.1 • Recommended testing practices for different use cases • Definition of the process for testing of IEC 61850 based devices and systems using communications instead of hard wired system interfaces (ex. GOOSE and SV instead of hardwired interfaces) • Use cases related to protection and control functions verification and testing This document does not cover the conformance testing of devices according to IEC 61850-10 or methodologies for testing of abstract device independent functions.
Abstract
Overview - IEC TR 61850-10-3:2022 (Functional testing of IEC 61850 systems)
IEC TR 61850-10-3:2022 provides practical guidance for functional testing of IEC 61850 systems in substations. It complements the quality assurance stages defined in IEC 61850-4:2011 by focusing on end‑user requirement fulfilment rather than IED manufacturer development. The report describes a methodical approach for verification and validation (V&V), use of IEC 61850 resources (Edition 2.1) for testing, recommended practices for common use cases, and processes for testing using communication-based interfaces (e.g., GOOSE and Sampled Values (SV)) instead of traditional hard‑wired connections.
Key Topics and Technical Requirements
- Verification & Validation approach: A structured V&V workflow for substation solutions, aligned with the V‑Model (unit → integration → system testing).
- Testing-related IEC 61850 features: Use of mode/behavior attributes, logical device hierarchy, data processing rules, blocking and substitution mechanisms, and referencing (InRef/GrRef) to support simulation and test injection.
- Test methods and practices: Unit testing, subsystem/interface testing, system (end‑to‑end) testing, and site acceptance test (SAT) sequences tailored to IEC 61850 systems.
- Use cases and sequences: Detailed examples including breaker failure protection and Select Before Operate (SBO) schemes, with recommended test sequences and interface definitions.
- Communication-based testing: Testing IEDs and protection/control schemes using GOOSE and SV messages in place of hardwired signals.
- Modeling, engineering and test-system design: Object modelling of test devices, engineering of simulators, and considerations for test system impact on substation LAN traffic.
- Functional and cyber security considerations: Guidance on secure testing practice and remote testing architectures.
- Scope limitation: Applicable to substation domain; conformance testing per IEC 61850-10 and abstract device-independent testing methodologies are outside scope.
Practical Applications - Who Uses IEC TR 61850-10-3
- Power utility protection & control engineers performing acceptance testing and commissioning of IEC 61850 substations.
- System integrators coordinating site acceptance tests and end‑to‑end verification of protection schemes.
- Test engineers and lab teams developing test plans, simulators, and automation for IEC 61850 functional tests.
- Asset owners and operators adopting IEC 61850 who need to validate that delivered systems meet functional requirements.
- Vendors and integrators implementing test features in IEDs or test equipment to support realistic simulation and SAT.
Related Standards
- IEC 61850 family (notably IEC 61850‑4:2011 for QA stages, IEC 61850‑7‑1, IEC 61850‑7‑4 for modelling)
- IEC 61850‑10 (conformance testing - outside this TR’s scope)
- IEC 81346 (single line diagram conventions referenced)
This technical report is a practical reference for implementing robust, communication‑based functional testing of IEC 61850 substations, improving reliability and reducing commissioning risk. Keywords: IEC TR 61850-10-3, IEC 61850, functional testing, substation testing, GOOSE, SV, IED testing, protection and control.
Технические детали
- Технический комитет
- TC 57 - Power systems management and associated information exchange
- SKU
- IEC TR 61850-10-3:2022
Похожие стандарты
Стандарты, упомянутые в описании
IEC 61850-4:2011
ДействующийCommunication networks and systems for power utility automation - Part 4: System and project management
Overview IEC 61850-4:2011 (Edition 2.1, consolidated 2020) defines system and project management requirements for utility automation systems (UAS), including substation automation systems (SAS). Part…
IEC TR 61850-90-30:2025
ДействующийCommunication networks and systems for power utility automation - Part 90-30: IEC 61850 Function Modelling in…
Overview IEC TR 61850-90-30:2025 (Communication networks and systems for power utility automation - Part 90-30) is a Technical Report that defines extensions to the SCL Substation/Process Section to…
IEC 61850-10:2012
ДействующийCommunication networks and systems for power utility automation - Part 10: Conformance testing
Overview IEC 61850-10:2012 (Consolidated with Amendment) defines standardized methods for conformance testing within the IEC 61850 family - the communications framework for power utility automation.…
IEC 61850-7-1:2011
ДействующийCommunication networks and systems for power utility automation - Part 7-1: Basic communication structure - P…
Overview - IEC 61850-7-1:2011 (Principles and models) IEC 61850-7-1 defines the basic communication structure, modelling methods and principles used across the IEC 61850 family for power utility auto…
IEC 61850-7-420:2009
ДействующийCommunication networks and systems for power utility automation - Part 7-420: Basic communication structure -…
Overview IEC 61850-7-420:2009 is a part of the IEC 61850 family that specifies information models for Distributed Energy Resources (DER). It defines logical nodes (LNs) and common data classes used t…
EN IEC 81346-14:2026
ДействующийIndustrial systems, installations and equipment and industrial products - Structuring principles and referenc…
Overview EN IEC 81346-14:2026 establishes the structuring principles and rules for reference designation of manufacturing and processing systems. Published by CLC and developed in alignment with IEC…